客户 & 项目
|
合同
|
产品
|
数量
|
材质
|
年份
|
SABALAN METHANOL PROJECT
DENA PLANT
|
1205-00-PI-POR-400
|
Duplex Seamless Tubes
|
6661 pcs
|
SS
|
2021
|
SIRAF METHANOL PROJECT
|
1246-PO-4-EMM-24422
|
Bolt & Nuts
|
85 Ton
|
Special Material
|
2021
|
HDPE PIDEC Project
|
1240-RE-POR-363
|
Geomembrane Extruder Package
|
67 Ton
|
Package Machine
|
2021
|
SABALAN METHANOL PROJECT
DENA PLANT
|
1205-00-PI-POR-405C
|
Bolt
|
20 Ton
|
CS AS
|
2021
|
SABALAN METHANOL PROJECT
DENA PLANT
|
1205-00-PI-POR-422E
|
Piping
|
5 Ton
|
CS AS
|
2021
|
SABALAN METHANOL PROJECT
DENA PLANT
|
1205-00-PI-POR-401E
|
pipe flange fitting
|
394 Ton
|
CS AS SS
|
2021
|
SABALAN METHANOL PROJECT SABALAN PLANT
|
1203-00-PI -POR-404C
|
Valves
|
10 Ton
|
SS
|
2021
|
SABALAN METHANOL PROJECT SABALAN PLANT
|
1203-00-EL-POR-514
|
CLOSED CIRCUIT TELEVISION SYSTEM
|
1 Set
|
Special Type
|
2021
|
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
|
1205-00-PV-POR-201D
& 1205-00-HM-POR-251
|
Plate
|
163 Ton
|
Special Material
|
2020
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-IN-POR-632 Amendment 1
|
Joint
|
1 Ton
|
SS
|
2020
|
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
|
1203-POR- PV-204B/B Amendment 2
|
Strainer
|
1 Ton
|
SS
|
2020
|
APADANA Methanol Project
|
1204-00-EL-POR-522
|
MV Electrical Motors for Primary Reformer
|
22 Ton
|
SS
|
2020
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-POR- PV-204B/B Amendment 1
|
Elbow/Flange/ Valve
|
1 Ton
|
AS
|
2020
|
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
|
1203-POR- PV-204B/B
|
pipe fitting etc.
|
1 Ton
|
CS
|
2020
|
SABALAN METHANOL PROJECT
DENA PLANT
|
1205-00-PI-POR-426A
|
60" Elbow
|
147 Ton
|
CS
|
2020
|
SABALAN METHANOL PROJECT
DENA PLANT
|
1205-00-EL-POR-528
|
Local Control Station
|
5 Ton
|
Aluminium
|
2020
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-401F
|
Flange,Valve,Fitting ,SMLS Pipe
|
5 Ton
|
CS AS SS
|
2020
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-405C Amendment 1
|
Bolts & Nuts
|
6 Ton
|
AS
|
2020
|
HENGAM PETROCHEMICAL COMPANY
|
1208-00-RE-POR-301
|
Compressor Auxiliary Equipment
|
508 Ton
|
Compressor Package
|
2020
|
SABALAN METHANOL PROJECT SABALAN PLANT & DENA PLANT
|
1203-00-EL-POR-515
|
Electrical Distribution Panel and Spare Parts
|
4 Ton
|
Electrical Panel
|
2020
|
SABALAN METHANOL PROJECT SABALAN PLANT & DENA PLANT
|
1203-00-HM-POR-270 G
|
Steel Coils
|
102 Ton
|
SS 304/304L
|
2020
|
EUROSLOT PARS
|
1203-00-HM-POR-256B/H
|
Stainless Steel Coils
|
68 Ton
|
A240 410S
|
2020
|
EUROSLOT PARS
|
1203-00-HM-POR-256B/Z
|
Stainless Steel Wire & Rod Items
|
15 Ton
|
SS304L 316L 347H
|
2020
|
SABALAN METHANOL PROJECT SABALAN PLANT
|
1203-00-PV-POR-204D
|
Separator Vessel
|
1 Set
|
SS 316L / SA516 GR.70
|
2019
|
SABALAN METHANOL PROJECT SABALAN PLANT
|
1203-00-HM-POR-257E
|
SYN-Gas Compressor
|
2 Set
|
SS 316L / SA516 GR.70
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-422D Amendment 04
|
Fitting
|
1 Ton
|
CS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-REQ-405C
|
Bults & Nuts
|
26 Ton
|
CS AS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
|
1203-00-EL-REQ-515
|
Electracal Heat Tracing
|
5 Ton
|
/
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
|
1203-00-IN-POR-606A Amendment 01
|
Safety / Relief Valve
|
1 Ton
|
CS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-EL-POR-528
|
Local Control Station
|
5 Ton
|
SS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-por-411A
|
Hose & Hose Coupling
|
2 Ton
|
SS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-422D Amendment 03
|
Fitting
|
5 Ton
|
CS AS SS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-402D Amendment 03
|
Flange
|
3 Ton
|
CS AS SS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-401D Amendment 03
|
Pipe
|
17 Ton
|
CS SS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PR-REQ-106
|
Reactor Filling Material
|
191 Ton
|
Ceramin Ball
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
|
1203-00-EL-REQ-508B
|
Ex. Lighting & Distribution Panel Boards
|
8 Ton
|
SS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
|
1203-00-IN-POR-632
|
Instrument Tubes And Fittings
|
16 Ton
|
CS SS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
|
1203-00-IN-POR-606A
|
Safety / Relief Valve
|
9 Ton
|
SS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-402D/Additional
|
Flange Fitting
|
7 Ton
|
CS SS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-422D Amendment 02
|
Fitting
|
68 Ton
|
CS AS SS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-402D Amendment 02
|
Flange
|
8 Ton
|
CS AS SS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-401D Amendment 02
|
Pipe
|
80 Ton
|
CS AS SS
|
2019
|
SABALAN METHANOL PROJECT
DENA PLANT
|
1205-00-PI-POR-423B
|
Flange Pipe
|
281 Ton
|
CS AS SS
|
2019
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-401 AA/Damage Pipe
|
Damage Fitting
|
6 Ton
|
CS
|
2019
|
SABALAN METHANOL PROJECT
DENA PLANT
|
1205-00-PI-POR-422D
|
Fitting
|
153 Ton
|
CS AS SS
|
2018
|
SABALAN METHANOL PROJECT
DENA PLANT
|
1205-00-PI-POR-402D
|
Flange
|
104 Ton
|
CS SS
|
2018
|
SABALAN METHANOL PROJECT
DENA PLANT
|
1205-00-PI-POR-401D
|
Pipe
|
504 Ton
|
SS CS
|
2018
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-EL-POR-530
|
Cable Gland
|
5 Ton
|
Special Material
|
2018
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-405B
|
Bolts & Nuts
|
64 Ton
|
CS SS
|
2018
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-422D Amendment 01
|
Fitting
|
81 Ton
|
CS AS SS
|
2018
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-402D Amendment 01
|
Flange
|
65 Ton
|
CS AS SS
|
2018
|
SABALAN METHANOL PROJECT
SABALAN PLANT
|
1203-00-PI-POR-401D Amendment 01
|
Pipe
|
274 Ton
|
SS CS 347H
|
2018
|
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
|
1203-00-PI-POR-401C
1203-00-PI-POR-402C
1203-00-PI-POR-422C
|
Pipe Flange Fitting
|
1366 Ton
|
CS AS SS
|
2018
|
SABALAN METHANOL PROJECT
|
1203-POR-IN-631
|
Pipe, Fitting, Gate valve
|
9793.5 Ton
|
CS
|
2016
|
SABALAN METHANOL PROJECT
|
1203-00-PI-POR-401B/402B/422B/423B /461A/462A
|
Fittings/Pipe/ Flange
|
4523 Ton
|
CS/AS/SS
|
2016
|
SABALAN METHANOL PROJECT
|
1203-00-PI-POR-405B
|
Bolt
|
190 Ton
|
CS/SS
|
2016
|
BANDAR ABBAS Gas Gathering REFINERY GASOLINE PRODUCTION INCREASE PROJECT
|
L-1015-POR-PV-201D
|
Gasket
|
9 Ton
|
SS
|
2015
|
Third Ammonia & Urea Plants in Shiraz
|
1198-POR-PV-230A
|
Plate
|
31Ton
|
CS
|
2015
|
BANDAR ABBAS Gas Gathering REFINERY GASOLINE PRODUCTION INCREASE PROJECT
|
L-1015-POR-PI-401E&
L- 1015-POR-PI-402D
|
Fittings/Pipe/ Flange
|
6 Ton
|
CS/AS/SS
|
2014
|
REFINERY GASOLINE PRODUCTION INCREASE PROJECT
|
L-1015-POR-PI-401E
|
Fittings / Pipe
|
3 Ton
|
CS/SS
|
2014
|
Gas Gathering BANDAR ABBAS REFINERY GASOLINE PRODUCTION INCREASE PROJECT
|
L-1015-POR-PI-402D
|
Flange
|
27 Ton
|
CS/AS/SS
|
2014
|
BANDAR ABBAS REFINERY PROJECT
|
L-1015-POR-PI-401E
|
Fitting / Pipe
|
361 Ton
|
CS/AS/SS
|
2014
|
Third Ammonia & Urea Plants in Shiraz
|
1198-POR-IN-615
|
Sight Glass
|
1 Ton
|
CS
|
2014
|
ABADAN REFINERY RENOVATION PROJECT PHASE III
|
1195-REQ-PI-406B
|
Steam trap
|
3 Ton
|
CS/SS
|
2013
|
ABADAN REFINERY RENOVATION PROJECT PHASE III
|
1195-POR-PI-465A
|
Flange, Pipe, fitting
|
10 Ton
|
CS
|
2013
|
BANDAR ABBAS REFINERY GASOLINE PRODUCTION PROJECT
|
L-1015-POR-PI-402D
|
Flange, Stud Bolt , Spacer& Blank
|
1 Ton
|
CS
|
2013
|
BANDAR ABBAS REFINERY GASOLINE PRODUCTION INCREASE PROJECT
|
L-1015-POR-PI-401E
|
Fitting, Pipe
|
920 Ton
|
CS/AS/SS
|
2013
|
ABADAN REFINERY PHASE 3 PROJECT
|
1195-INQ-PI-401P
|
Flange, Fitting, Pipe
|
80 Ton
|
CS/AS/SS
|
2012
|
DENA METHANOL PROJECT
|
1205-POR-PI-401A
|
Pipe
|
455 Ton
|
CS
|
2011
|
SABALAN METHANOL PROJECT
|
1203-POR-PI-401A
|
Pipe
|
454 Ton
|
CS
|
2011
|
DENA METHANOL PROJECT
|
1205-POR-PI-422A/423A 1203-POR-PI-422A/423A
|
Fitting
|
22 Ton
|
CS/SS
|
2011
|
ABADAN REFINERY PHASE3 PROJECT
|
1195-INQ-PI-401N
|
Flange, Fitting, Pipe
|
145 Ton
|
CS/AS/SS
|
2011
|
Sepehr Rosemond Engineering & Construction Co.(SERECO) (Aboozar A9-AA New 24 Pipeline Project)
|
87-003-ABP-BM
|
Swivel / Anchor/ Flange
|
11 Ton
|
CS/625Cladding
|
2009
|
Khareg Gas Gathering Project
|
1181-KHG2-00-PI-POR-410B
|
Flange, Fitting Bolt & Nut, Pipe, Gasket, Valve
|
100 Ton
|
CS/AS/SS
|
2008
|