Projects

Customer & Project Contract No. Product Qty Material Year
SABALAN METHANOL PROJECT
DENA PLANT
1205-00-PI-POR-400 Duplex Seamless Tubes 6661 pcs SS 2021
SIRAF METHANOL PROJECT  1246-PO-4-EMM-24422  Bolt & Nuts 85 Ton Special Material 2021
HDPE PIDEC Project 1240-RE-POR-363 Geomembrane Extruder Package 67 Ton Package Machine 2021
SABALAN METHANOL PROJECT
DENA PLANT
1205-00-PI-POR-405C Bolt 20 Ton CS AS 2021
SABALAN METHANOL PROJECT
DENA PLANT
1205-00-PI-POR-422E Piping 5 Ton CS AS 2021
SABALAN METHANOL PROJECT
DENA PLANT
1205-00-PI-POR-401E pipe flange fitting 394 Ton CS AS SS 2021
SABALAN METHANOL PROJECT SABALAN PLANT 1203-00-PI -POR-404C Valves 10 Ton SS 2021
SABALAN METHANOL PROJECT SABALAN PLANT  1203-00-EL-POR-514 CLOSED CIRCUIT TELEVISION SYSTEM 1 Set Special Type 2021
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
1205-00-PV-POR-201D
& 1205-00-HM-POR-251
 Plate 163 Ton Special Material 2020
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-IN-POR-632 Amendment 1 Joint 1 Ton SS 2020
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
1203-POR- PV-204B/B Amendment 2 Strainer 1 Ton SS 2020
APADANA Methanol Project 1204-00-EL-POR-522 MV Electrical Motors for Primary Reformer 22 Ton SS 2020
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-POR- PV-204B/B Amendment 1 Elbow/Flange/ Valve 1 Ton AS 2020
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
1203-POR- PV-204B/B pipe fitting etc. 1 Ton CS 2020
SABALAN METHANOL PROJECT
 DENA PLANT
1205-00-PI-POR-426A 60" Elbow 147 Ton CS 2020
SABALAN METHANOL PROJECT
 DENA PLANT
1205-00-EL-POR-528 Local Control Station 5 Ton Aluminium 2020
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-401F Flange,Valve,Fitting ,SMLS Pipe 5 Ton CS AS SS 2020
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-405C Amendment 1 Bolts & Nuts 6 Ton AS 2020
HENGAM PETROCHEMICAL COMPANY 1208-00-RE-POR-301 Compressor Auxiliary Equipment 508 Ton Compressor Package 2020
SABALAN METHANOL PROJECT SABALAN PLANT & DENA PLANT 1203-00-EL-POR-515 Electrical Distribution Panel and Spare Parts 4 Ton Electrical  Panel 2020
SABALAN METHANOL PROJECT SABALAN PLANT & DENA PLANT 1203-00-HM-POR-270 G Steel Coils 102 Ton SS 304/304L 2020
EUROSLOT PARS 1203-00-HM-POR-256B/H Stainless Steel Coils 68 Ton A240 410S 2020
EUROSLOT PARS 1203-00-HM-POR-256B/Z   Stainless Steel Wire & Rod Items 15 Ton SS304L 316L 347H 2020
SABALAN METHANOL PROJECT SABALAN PLANT 1203-00-PV-POR-204D Separator Vessel 1 Set SS 316L / SA516 GR.70 2019
SABALAN METHANOL PROJECT SABALAN PLANT  1203-00-HM-POR-257E SYN-Gas Compressor 2 Set SS 316L / SA516 GR.70 2019
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-422D Amendment 04 Fitting  1 Ton CS  2019 
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-REQ-405C Bults & Nuts 26 Ton CS AS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
1203-00-EL-REQ-515 Electracal Heat Tracing 5 Ton / 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
1203-00-IN-POR-606A Amendment 01 Safety / Relief Valve 1 Ton CS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-EL-POR-528 Local Control Station 5 Ton SS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-por-411A Hose & Hose Coupling 2 Ton SS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-422D Amendment 03 Fitting  5 Ton CS AS SS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-402D Amendment 03 Flange 3 Ton CS AS SS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-401D Amendment 03 Pipe 17 Ton CS SS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PR-REQ-106 Reactor Filling Material 191 Ton Ceramin Ball 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
1203-00-EL-REQ-508B Ex. Lighting & Distribution Panel Boards 8 Ton SS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
1203-00-IN-POR-632 Instrument Tubes And Fittings 16 Ton CS SS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
1203-00-IN-POR-606A Safety / Relief Valve 9 Ton SS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-402D/Additional Flange  Fitting  7 Ton CS SS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-422D Amendment 02 Fitting 68 Ton CS AS SS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-402D Amendment 02 Flange 8 Ton CS AS SS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-401D Amendment 02 Pipe 80 Ton CS AS SS 2019 
SABALAN METHANOL PROJECT
DENA PLANT
1205-00-PI-POR-423B Flange Pipe 281 Ton CS AS SS 2019 
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-401 AA/Damage Pipe Damage Fitting 6 Ton CS 2019 
SABALAN METHANOL PROJECT
DENA PLANT
1205-00-PI-POR-422D Fitting 153 Ton CS AS SS 2018
SABALAN METHANOL PROJECT
DENA PLANT
1205-00-PI-POR-402D Flange 104 Ton CS SS  2018
SABALAN METHANOL PROJECT
DENA PLANT
1205-00-PI-POR-401D  Pipe 504 Ton SS CS 2018
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-EL-POR-530 Cable Gland 5 Ton Special Material 2018
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-405B Bolts & Nuts 64 Ton CS SS 2018
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-422D Amendment 01  Fitting 81 Ton CS AS SS 2018
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-402D Amendment 01  Flange 65 Ton CS AS SS 2018
SABALAN METHANOL PROJECT
SABALAN PLANT
1203-00-PI-POR-401D Amendment 01  Pipe 274 Ton SS CS 347H 2018
SABALAN METHANOL PROJECT
SABALAN PLANT & DENA PLANT
1203-00-PI-POR-401C
1203-00-PI-POR-402C
1203-00-PI-POR-422C
Pipe Flange Fitting 1366 Ton CS AS SS  2018
SABALAN METHANOL PROJECT 1203-POR-IN-631 Pipe, Fitting, Gate valve 9793.5 Ton CS 2016
SABALAN METHANOL PROJECT 1203-00-PI-POR-401B/402B/422B/423B /461A/462A Fittings/Pipe/ Flange  4523 Ton CS/AS/SS 2016
SABALAN METHANOL PROJECT 1203-00-PI-POR-405B Bolt 190 Ton CS/SS 2016
BANDAR ABBAS Gas Gathering REFINERY GASOLINE PRODUCTION INCREASE PROJECT L-1015-POR-PV-201D Gasket 9 Ton SS 2015
Third Ammonia & Urea Plants in Shiraz 1198-POR-PV-230A Plate 31Ton CS 2015
BANDAR ABBAS Gas Gathering REFINERY GASOLINE PRODUCTION INCREASE PROJECT L-1015-POR-PI-401E&
L- 1015-POR-PI-402D
Fittings/Pipe/ Flange  6 Ton CS/AS/SS 2014
REFINERY GASOLINE PRODUCTION INCREASE PROJECT L-1015-POR-PI-401E Fittings / Pipe 3 Ton CS/SS 2014
Gas Gathering BANDAR ABBAS REFINERY GASOLINE PRODUCTION INCREASE PROJECT L-1015-POR-PI-402D Flange 27 Ton CS/AS/SS 2014
BANDAR ABBAS REFINERY PROJECT L-1015-POR-PI-401E Fitting / Pipe 361 Ton CS/AS/SS 2014
Third Ammonia & Urea Plants in Shiraz 1198-POR-IN-615 Sight Glass 1 Ton CS 2014
ABADAN REFINERY RENOVATION PROJECT PHASE III 1195-REQ-PI-406B Steam trap 3 Ton CS/SS 2013
ABADAN REFINERY RENOVATION PROJECT PHASE III 1195-POR-PI-465A Flange, Pipe, fitting 10 Ton CS 2013
BANDAR ABBAS REFINERY GASOLINE PRODUCTION PROJECT L-1015-POR-PI-402D Flange, Stud Bolt , Spacer& Blank 1 Ton CS 2013
BANDAR ABBAS REFINERY GASOLINE PRODUCTION INCREASE PROJECT L-1015-POR-PI-401E Fitting, Pipe 920 Ton CS/AS/SS 2013
ABADAN REFINERY PHASE 3 PROJECT 1195-INQ-PI-401P Flange, Fitting, Pipe 80 Ton CS/AS/SS 2012
DENA METHANOL PROJECT 1205-POR-PI-401A Pipe 455 Ton CS 2011
SABALAN METHANOL PROJECT 1203-POR-PI-401A Pipe 454 Ton CS 2011
DENA METHANOL PROJECT 1205-POR-PI-422A/423A 1203-POR-PI-422A/423A Fitting 22 Ton CS/SS 2011
ABADAN REFINERY PHASE3 PROJECT 1195-INQ-PI-401N Flange, Fitting, Pipe 145 Ton CS/AS/SS 2011
Sepehr Rosemond Engineering & Construction Co.(SERECO) (Aboozar A9-AA New 24 Pipeline Project) 87-003-ABP-BM Swivel / Anchor/ Flange 11 Ton CS/625Cladding 2009
Khareg Gas Gathering Project 1181-KHG2-00-PI-POR-410B Flange, Fitting Bolt & Nut, Pipe, Gasket, Valve 100 Ton CS/AS/SS 2008